lakeney Leigh were retained by London Borough of Southwark to design and manage the external refurbishment of all of Southwark’s Solid wall constructed blocks. A total of 59 blocks were covered in
External Wall Insulation (EWI). All blocks went through a pre-planning process, Blakeney Leigh provided a resident consultation process providing residents with detailed block elevation drawings showing colour options, then a further 8 week planning process was observed before works progressed. A full project management service was provided with detailed snagging of all works carried out.
The following show the difference in U-Values that External Wall Insulation (EWI) creates and how the likelihood of condensation risk is severely reduced.
SERVICES PROVIDED
SEE MORE
Cladding Remediation
Cladding remediation – what’s really tolerable? Since the Building Safety Act 2022 brought in new legislation around higher-risk [...]
Tips on how to create a more thermally efficient home
With the future of construction and design now focused on being more sustainable and zero-carbon conscious due to [...]
What is a dilapidations survey and when would I need one?
If you are renting a property it is normally your responsibility to keep it in good condition. Now, [...]
The Role of a Quantity Surveyor and How We Could Help You
If you are a contractor, architect or developer, then you will likely know some of the reasons for [...]
Our Team Explains The Purpose of a Feasibility Study
When starting any new project, one of the most important steps is to carry out a feasibility study. [...]
Restoring and Cleaning Stone Facades: Techniques to Minimise Damage
Stone facades are a beautiful feature of many buildings, both old and new. However, they can become quite [...]
Get Social